THE DISPATCH PRINTING COMPANY
The WBNS 10 TV Transmitter Facility stores turbine fuel (Jet A) in a 10,000 gallon above ground storage tank for use in the television station’s helicopter and the emergency generators. L&A was contracted to update and certify the existing Spill Prevention Control and Countermeasures (SPCC) Plan to maintain compliance with Title 40 Code of Federal Regulations, Part 112 and OEPA rules regarding spillage of oil. As part of this assignment, L&A’s Professional Engineer conducted an on-site examination to evaluate site conditions and identify the new Emergency Coordinator for the facility. Updates, namely administrative changes to the contact list and basic figure revisions, were made and submitted to the client in the same format as the existing SPCC plan.